Gateway Center at
Bronx Terminal Market

Square Footage
1 Million SF/retail
1 Million SF/parking

Architect
Brennan Beer Gorman Architects
Greenburg Farrow

Geotechnical & Environmental Designer
Langan Engineering &
Environmental Services

Structural
Axis Design Group, Inc. LC

Thorton Tomasetti
Group/LZA Associates

Mechanical
Glickman Engineering PLLC

Roadway
Dewberry-Goodkind Inc.





 
Portfolio - Retail              << BACK
Gateway Center at Bronx Terminal Market
725 Exterior Street, Bronx, NY


Plaza Construction has been hired as the Construction Manager for the redevelopment of 16.5 acres of former food/produce market and the Bronx Mens House of Detention into 1 million SF of retail space and it’s required parking. Much of the historic stonework (including the BMHD guard house, visitor’s entrance, and frieze panel band) will be salvaged and utilized in the construction. The PROW Building, a V-configured structure, will be renovated while maintaining the existing general appearance.

Two 500,000 SF multi-story “big box” retail buildings will be constructed. Other smaller buildings will be used for medium & small retail as well as restaurants. Home Depot, Staples, Bed Bath and Beyond, Target, Best Buy, and Marshall’s are just a few of the future tenants. A 1-million SF multi-level parking garage structure will also be built onsite.

Challenges include the expansion of an off ramp for the Major Deegan Expressway, the complete replacement of all utilities, storm & sanitary sewer, water, gas, telephone and electric for 1400 feet of Exterior Street, accommodating the foundations for the MDE widening, and remediations of the entire 16.5 acres under the DEP’s Brown Fields program.

The project includes a LEEDS agreement which obligates re-use of materials. This will be achieved by salvaging all masonry and concrete from the demolished buildings and turning that material into recycled concrete aggregate or recycled concrete. This process will be performed on-site utilizing crushing equipment.

The grand opening is scheduled for September 2009.





   